OT

Operational Technology

Signals from PLCs, sensors and meters become manufacturing data, keyed to time and equipment.

OVERVIEW

Scattered equipment signals, as data on one time and equipment basis

Signals and records scattered by equipment

  1. 01PLC and metering connectionConfigures the communications, tags and measuring points of equipment and sensors.
  2. 02OPC UA · EdgeLinks signals to time and checks the collection state.
  3. 03SCADA · operations monitoringConnects current values, faults and recovery history to operations.

ROADMAP

Every transformation starts with connected equipment

Signals from machines of every make and age are gathered into the raw data every later stage works from.

STEP 1 / 6
This stage
  1. 01
    OTEquipment connectionSignals from PLCs, sensors and legacy machines
What it leads to
  1. 02
    DATAData standardsAssets and data in one format with AAS
  2. 03
    DXDigital operationsProduction, quality, energy and work records in the systemView page ›
  3. 04
    AXAI decisionsPrediction and recommendation from the dataView page ›
  4. 05
    GXCarbon and energyEmissions accounting and reductionView page ›
  5. 06
    Physics AIFloor executionAI decisions carried into machines and robotsView page ›

SYSTEM ARCHITECTURE

From field devices to the systems above, in one flow

01 / INPUT

01Field devicesPLCs · sensors · meters
02Signal basistags · units · collection intervals
03NetworkOPC UA · equipment network

CONNECTED OPERATIONS

OT · Edge Gateway

Devices and tags connected
Time, units and quality checked
State monitored and data passed on

03 / OUTPUT

✓Equipment datarunning · stopped · process values
✓Energy dataelectricity · gas · flow
✓Collection operationslink state · errors · history
Linked by common identifiers, master data and historyResults checked → fed into the next run
Who uses itProduction · equipment ownersElectrical · instrumentation ownersPlant IT · OT owners

KEY FEATURES

Four capabilities, each with its own workflow

Decide which signals in the process to collect.

  1. 01

    Survey

    equipment · devices · communications

  2. 02

    Metering points

    temperature · power · vibration

  3. 03

    Tags

    ID · unit · interval

  4. 04

    Check

    signal · time · quality

Recorded alongside

01

Equipment · metering point IDs

02

Communication · tag list

03

Units · collection interval

Operating check

Can the required signals be read?

YES

Confirmed → collection test

NO

Unsupported → add sensor or communication

An example workflow · the detailed links and criteria are set to suit your floor.

PROCESS

Four steps from assessment to rollout

Collection is proven on one representative process first, then extended to the rest on the same standard.

  1. Site assessment

    • Survey equipment, PLCs and meters
    • Check the network and comms
    • Choose the scope and signals
  2. Collection design

    • Define the tag map and intervals
    • Set time, unit and equipment-ID standards
    • List what goes to upstream systems
  3. Connection · setup

    • Install the Edge Gateway
    • Connect PLCs, sensors and meters
    • Set up the path upstream
  4. Validation · rollout

    • Pilot collection and quality check
    • Verify fault recovery
    • Extend to more equipment and hand over

FAQ

Frequently asked questions

  • Which equipment can be connected?
  • Can old machines with no communication port be connected?
  • Where does the collected data go?
  • What happens to the data when communication drops?
  • Where do we start?

CONNECT THE NEXT

Connected solutions

The solutions that take this one's data and results and carry them on.

See all solutions →

START WITH YOUR FACTORY

Start with your factory's own challenges

Check where you stand with the AX readiness check first, then carry on to a consultation.

Request a consultation