AX Solution
Process Optimization
Due dates, equipment load and stock are read together, for a production plan that can run.
OVERVIEW
From production plans that keep changing to schedules the floor can run
Changed orders colliding with equipment load
- 01One planning basisOrders, due dates, equipment capacity and stock are brought onto one basis.
- 02Schedule optionsJob sequences and equipment assignments are compared within the constraints.
- 03Run and replanThe approved plan goes to MES, and a delay sends it back for replanning.
WHY OPTIMIZATION
Recalculated on change, not re-planned by hand
- 01
Reads orders and due dates, equipment capacity, staffing and shifts, stock, routing and changeover times together, on a single basis.
- 02
Spots bottlenecks and delivery risks while the plan is still being made, and proposes feasible alternative plans to compare.
- 03
Once a planner confirms the plan, it becomes MES work orders, and any gap against actual output feeds back into the next plan.
Planning basis
AI process optimizationDue dates, capacity and stock combined
- Manual / Excel planning
- Planner experience
- Rule-based scheduling
- Fixed priority rules
Responding to change
AI process optimizationOptions recalculated and compared
- Manual / Excel planning
- Re-plan by hand
- Rule-based scheduling
- Rules re-applied
Bottleneck detection
AI process optimizationPredicted during planning
- Manual / Excel planning
- After the fact
- Rule-based scheduling
- Limited to some processes
Execution
AI process optimizationMES work orders, with actuals fed back
- Manual / Excel planning
- Manual instructions
- Rule-based scheduling
- Handed over separately
KEY FEATURES
Four capabilities for production planning
From automatic scheduling to plan simulation, bottleneck analysis and due-date risk monitoring.
Planning Capability
01 / 04
01
Constraint-based scheduling
Plan simulation
Bottleneck & load analysis
Due-date risk monitoring
Order, equipment, material and shift constraints are applied to build each machine's schedule automatically, shown as a Gantt chart. Planners adjust the sequence on screen, and confirmed schedules are versioned and released to the floor.
Management Scope
- Gantt chart
- Automatic scheduling
- Machine assignment
- Manual resequencing
- Schedule versions
- Release to floor
WORKFLOW
Each capability, as the work actually runs
For each capability, the order it runs in and the check it passes before moving on.
Orders and real capacity on one basis
- 01
Demand
item · quantity · due date
- 02
Resources
equipment · shifts · people
- 03
Constraints
routing · material · changeover
- 04
Plan basis
available time · priority
Recorded alongside
Orders · process routing
Capacity · operating calendar
Material · changeover time
Are the material and equipment conditions for the job met?
Feasible jobs → plan candidates
Short resources → check procurement · schedule
An example workflow · the detailed links and criteria are set to suit your floor.
SYSTEM ARCHITECTURE
What it connects, and the work it leads to
From the data that goes in to the results on the floor.
01 / INPUT
CONNECTED OPERATIONS
AI Process Optimization
03 / OUTPUT
01 / INPUT
CONNECTED OPERATIONS
AI Process Optimization
CONNECTED OPERATIONS
AI Process Optimization
03 / OUTPUT
METHOD
How it is built
Orders, resources and floor constraints go in, the plan is calculated, and the approved schedule goes back out to the floor.
Data Ingestion
ERP link
Orders · due dates · master data
MES link
Progress · output · stoppages
PLC / equipment
Run state · changeover history
Routing · eligible machines · shift calendars
Aligns plan and actual times
Target System
AI/ML Modeling
Planning & optimisation
Schedule optimisation
Constraint-based search
Due-date risk
From progress and load
Bottleneck detection
Load and queue analysis
Option comparison
Due date · load · changeover loss
Feedback & refinement
Production schedule
System integration
Delay risk alerts
Orders at risk flagged at once / replanning options offered
Built for plants with frequent order changes and tight equipment limits

Automotive parts

Metal processing

Machinery & equipment

Plastics & rubber

Semiconductors & electronics

Food

Automotive parts

Metal processing

Machinery & equipment

Plastics & rubber

Semiconductors & electronics

Food
Reads due dates and equipment load together, and recommends a plan that can run.
- Orders and due dates
- Equipment capacity and calendar
- Materials and stock
- Routing and changeover time
- MES actuals and stop history
- Due-date and resource constraints
- Bottleneck and delay risk search
- Schedule option recommendation
- On-time delivery
- Plan execution rate
- Production lead time
- Replanning time
EFFECT
What changes from planning to execution

- 01
Faster planning
Less time spent gathering order, stock and equipment data separately; plan options are compared on one basis.
Planning timeConsistent master data - 02
Better due-date response
Due dates and equipment load are read together, so orders at risk of delay surface first.
On-time deliveryOrders at risk - 03
Balanced equipment load
Jobs are spread with the load building up on each machine and its changeover time in mind.
Equipment loadChangeover time - 04
Quick replanning
When a rush order or a stoppage comes in, its impact is checked and an alternative plan is offered.
Replanning timeChange history
CONNECT THE NEXT
Connected solutions
The solutions that take this one's data and results and carry them on.
START WITH YOUR FACTORY
Start with your factory's own challenges
Check where you stand with the AX readiness check first, then carry on to a consultation.